Anduril delivered phase one headsets, tested with the 75th Ranger Regiment, and is now designing a digital-interface phase two version.
The new design cuts weight, expands field of view by 70%, and replaces the old IVAS system troops disliked.
A downselect and production award could come in fiscal 2028, with several hundred phase two systems testing early next year.
Anduril redesigns tech for Army’s Soldier Borne Mission Command program

